TRINITY TERMINAL
Area
124.3 Ha
Capacity
98,000 TEU
Length of quay
2,354m
7 container deep-sea berths
Depth of water below chart datum
15m for 910m of quay
14m for 918m of quay
11.9m for 300m of quay
11.6m for 226m of quay
27 Quayside Cranes
10 x 22 containers wide
3 x 20 containers wide
3 x 18 containers wide
9 x 16 containers wide
2 x 13 containers wide
74 Stacking Cranes
52 x 40 tonnes capacity (1 over 5)
22 x 35.6 tonnes capacity (1 over 4)
Fork Park
12 x 5 high stacking container forklifts.
3 top loading forklifts, 40 tonnes capacity
Total Port Reefer Points
1638
500 additional due for 2010
|
LANDGUARD TERMINAL
Area
27.9 Ha
Length of quay
554m
2 container berths
3 Quayside Cranes
3 x 13 containers wide
10 Stacking Cranes
10 x 35.6 tonnes capacity
Fork Park
12 x 5 high stacking container forklifts
NEW TERMINAL PHASE 1
Area
35.87 Ha
Capacity
1,000,000 TEU
Length of quay
730m
2 container berths
7 Quayside Cranes
7 x 24 containers wide
22 Stacking Cranes
22 x 40 tonnes capacity (1 over 5)
|
DOOLEY RO-RO TERMINAL
Area
3.4 Ha
Length of quay
Ro-Ro 3
174m @ 7.3m
Ro-Ro 4
250m @ 9.75m
RAIL TERMINAL
North
2 Nelcon rail-mounted gantry cranes
40 tonnes capacity
2 Morris rail mounted gantry cranes
35 tonnes capacity
2 Kalmar reachstackers
45 tonnes capacity
South
1 Morris rail-mounted gantry crane
30 tonnes capacity
1 ZPMC rail-mounted gantry crane
40 tonnes capacity
2 Kalmar reachstackers
45 tonnes capacity
1 ZPMC rail-mounted gantry crane (on order)
Please note: This marine information is provided for guidence only. Any vessel entering Harwich Harbour should contact Harwich Haven Authority for the latest sailing directions.
|